Charging site
ANAD Nicosia
Anavissou 2, 2025, Strovolos, 2025 Δήμος Στροβόλου, Λευκωσία. Electric car charging site with 1 charge point up to 22 kW, run by Petrolina.
Connectors
| Connector | Max. power | Number |
|---|---|---|
| Type 2 AC | 22.0 kW | 1 |
The price depends on the operator and on your payment method or membership: check it in the operator’s app before charging.
Opening hours, payment and access
- Opening hours
- Lunes 24 h · Martes 24 h · Jueves 24 h · Viernes 24 h · Domingo 24 h
- Payment
- not published
- Operator
- Petrolina
- Address
- Anavissou 2, 2025, Strovolos, 2025 Δήμος Στροβόλου, Λευκωσία
- Data updated
- —
Other chargers nearby
- Petrolina ENI Leof Lemesou Station 50 kW400 m
- EV Power · Δήμος Λευκωσίας 44 kW600 m
- Mall of Cyprus Left 22 kW1.0 km
- IKEA Left 22 kW1.1 km
- Nicosia General Hospital 7 kW1.3 km
- Electroline Latsia 22 kW1.6 km
- BMW HQ Nicosia 300 kW1.8 km
- EV Power · Δήμος Στροβόλου 44 kW1.8 km
In a hurry? Fast charging nearby
Petrolina ENI Leof Lemesou Station · 50 kW · 0.4 kmBMW HQ Nicosia · 300 kW · 1.8 kmUNICARS Nicosia Sales Hub · 50 kW · 1.9 kmEV Power · Δήμος Λευκωσίας · 200 kW · 3.3 kmUNICARS Nicosia Workshop · 50 kW · 5.2 km
Frequently asked questions
How much does charging cost at ANAD Nicosia?
It depends on the operator and on your payment method or membership. Check the total price in the operator’s app before charging.
Which connectors and what power?
1 × Tipo 2 22 kW.
Open data from the national access point, Department of Electrical and Mechanical Services (EMS), CC BY 4.0. There is no way to confirm whether it is working, free or has changed its price: check the operator’s app Electric car charge points in Λευκωσία.