ChargeTips

Fully electric · 2024–2024

How much it costs to charge the Polestar Polestar 2 Standard Range Single Motor (MY24)

66.0 kWh battery. Charging from 20 to 80% puts 39.6 kWh into the battery: see what it costs at home, how long it takes and what you pay at a public charger.

Battery
66.0 kWh
usable
Range
514 km
WLTP
AC charging
11.0 kW
at home and at standard chargers
DC charging
136 kW
fast charging
Polestar Polestar 2 Standard Range Single Motor (MY24)
Photo: Alexander Migl · CC BY-SA 4.0

Charging at home

Charging at home from 20 to 80%

On tariff 01, the time makes no difference: the same price at any hour. On tariff 02, charge at night (23h00 to 9h00), when a kWh costs a little less.

Tariff 01
€0.3000/kWh, single rate with all charges and VAT
13.07 €
Tariff 02, night
€0.2800/kWh, 23h00 to 9h00
12.20 €
Tariff 02, day
€0.3100/kWh: best avoided for charging
13.50 €
EAC tariff 01
€0.3000/kWh (EAC regulated tariff)
13.07 €

With 13,000 km a year, always charging at home costs about €656 on tariff 01 and €613 at night on tariff 02: you save 44 € a year.

Prices including 9% VAT, fuel adjustment, network charges, public service obligations and the renewables levy, based on EAC tariffs 01 and 02, checked on 2026-10. Standing charges not included. Includes 10% charging losses.

How long it takes to charge from 20 to 80%

ChargerTime
16 A commando socket or wallbox (3.7 kW) 11 h 46 min
7 kW home charger (32 A, 7.4 kW) 5 h 53 min
Fast charger, from 10 to 80% (up to 136 kW)34 min

Approximate times, losses included. On a fast charger, average power of 60% of the car’s maximum.

Public charging

At a public charger, the price depends on the operator. With an estimated price of €0.42/kWh on standard chargers and €0.45/kWh on fast chargers, charging from 20 to 80% costs about 16.63 € on a standard charger and 17.82 € on a fast charger.

Open the map

How much 100 km costs

Tariff 02, night
4.71 €
Tariff 01
5.05 €
Fast charger
6.89 €

With the official consumption of 15.3 kWh/100 km.

Frequently asked questions

How much does it cost to charge the Polestar Polestar 2 Standard Range Single Motor (MY24) at home?

Charging from 20 to 80% (39.6 kWh into the battery) costs about 13.07 € on tariff 01 and 12.20 € at night on tariff 02, VAT and losses included.

When should I charge the Polestar Polestar 2?

On tariff 01, at any time: the price is the same. On tariff 02, at night, from 11pm to 9am, when a kWh costs a little less.

How long does it take to charge the Polestar Polestar 2 at home?

From 20 to 80%, about 11 h 46 min on a 3.7 kW socket or wallbox and 5 h 53 min on a 7 kW home charger.

How long does it take on a fast charger?

From 10 to 80%, about 34 min on a charger that delivers the car’s maximum 136 kW. Allow about 17.82 € from 20 to 80% at a public charger.

Price in other countries

Starting price in each country, with local taxes and without incentives.

Other Polestar Polestar 2 versions

Sources of the technical data: ev-database.org